20m Fisheries Patrol Vessel – Full Design:
Length: 19.99m
Beam: 5.50m
Draft: 1.36m
Crew: 2 + 6 Special Personnel
Power: 2 x Caterpillar C18, 747kW
Speed: 28kn Maximum
Range: 500nm @ 20kn + margin
Survey: NSCV 2B
20m Fisheries Patrol Vessel – Full Design:
Length: 19.99m
Beam: 5.50m
Draft: 1.36m
Crew: 2 + 6 Special Personnel
Power: 2 x Caterpillar C18, 747kW
Speed: 28kn Maximum
Range: 500nm @ 20kn + margin
Survey: NSCV 2B
Added superstructure tier.
Conversion of open sundeck area into enclosed sky-lounge and flybridge. Detailed structural design and CNC parts, weights, and revised stability book.
Digital Templates for Hull Glazing – Shipset
Optical laser scan of finished (faired) vessel hull openings. Provide shipset of digital template drawings for manufacture of window glasses.
Dynamic Stability Investigation
The vessel was suffering sudden and uncontrollable broaches in relatively benign sea conditions. The unpredictable onset of the problem made the vessel virtually unusable. After doing basic static stability checks we surveyed the boat out of water, and determined rudder ventilation to be the main cause. Simple fences were designed and added, which cured the problem.
Preliminary structural design for dual (“stacked”) gyro-stabiliser installation. Aluminium hull vessel with steel subframe for upper stabiliser. Finite Element Analysis for fatigue life assessment.
Design and construction of 2 x 5m RIB patrol / workboats. Level floatation (swamped) design with double chines for RIB like performance.
Length: 5.00m
Beam: 2.35m
Draft: 0.40m
Crew: 2 + 2
Power: 70hp
Speed: 27 knots
Survey: NSCV NS Scheme
Designs available up to class 2C
Naval Architecture for 11.5m police boats; build of 50 boats for Indonesia National Police.
Design of catamaran hulls for demonstrator craft. General consultancy and advice on overall design aspects including powering, trim & stability, design loads, and survey.
For video please go to : www.nauti-craft.com
Vessel weight survey for motor yacht conversion project. Digitise lines, inclining experiment and new stability book.
Transportation advice for delivery of project linepipe via tug-barges and PSVs.